|
|
Document Type |
Document Name |
|
|
 |
DOE-SPR-EIS-0075-SA-04 - Operational and Engineering Modifications and Regulatory Review (Dec 2019) |
 |
DOE-EA-2073-01-SA - Supplement Analysis for SPR LE-II Work Packages (Nov 2019) |
 |
DOE/EA-2079 Final BM Raw Water Intake Structure Channel Upgrades (July 2018) |
 |
DOE-EA-2073 Final SPR LE-II EA (6 April 2018) |
 |
DOE-EA-2039 - WH Brine Disposal
Pipeline Replacement (Feb 2017) |
 |
DOE-EA-0252 (Rev) - Rev Seaway
Complex Distribution Enhancements
(Feb 1986)
|
 |
DOE-EA-0299 - Seaway Complex
Distribution Enhancements (Mar 1987) |
 |
DOE-EA-0401 - Sulphur Mines
Decommissioning + BH Expansion (Jan
1990) |
 |
DOE-FE-0221P - Candidate Sites
for Billion Barrel Expansion (Mar
1991) |
 |
DOE-EA-0804 - BM Brine Pipeline
Replacement (Sep 1993) |
 |
DOE-EA-0954 - Oil
Degasification at SPR Sites (Sep
1994) |
 |
DOE-EA-1003 - Leasing of St
James Terminal (Jan 1995) |
 |
DOE-EA-0151 - WI Decommissioning
(Dec 1995) |
 |
DOE-EA-1251 - BC Pipeline
Extension to Placid Refinery (Sep
1998) |
 |
DOE-EA-1289 - BH Crude Oil
Storage (Mar 1999) |
 |
WH-MM-463 - Replace WH Raw Water
Intake Pipeline, RONR (3-11-04) |
 |
DOE-EA-1505 - BM Increased
Capacity + Inventory (11-24-04) |
 |
DOE-EA-1497 - Replace WH Raw
Water Intake Pipeline (8-31-04) |
 |
DOE-EA-1523 - WH Raw Water
Intake Structure Site Modifications,
RONR (1-26-05) |
 |
FINAL WH RWIS EA-FONSI 11-23-05 |
 |
FES 76-2 - Final EIS, Strategic
Petroleum Reserve, Vol 1 (Dec 1976) |
 |
FES 76-2 - Final EIS, Strategic
Petroleum Reserve, Vol 2 (Dec 1976) |
 |
FES 76-5 - Final EIS, BC Salt
Dome (Dec 1976) |
 |
DOE-EIS-0001 - Final EIS, BM
Salt Dome (Dec 1977) |
 |
FES 77-2 - Final EIS, BM Kleer
Mine (Sep 1977) |
 |
FES 76-77-10 - Final EIS,
Ironton Mine (Jul 1977) |
 |
FES 76-77-9 - Final EIS, Central
Rock Mine (Jul 1977) |
 |
FES 76-77-8 - Supplement to EIS,
WI Mine (Aug 1977) |
 |
FES 76-77-8 - Final EIS, WI Mine
(Jan 1977) |
 |
FES 76-77-7 - Cote Blanche
Mine (Jan 1977) |
 |
FES 76-77-6 - Final EIS, BM
Salt Dome (Jan 1977) |
 |
FES 76-77-4
- Supplement to EIS, WH Salt Dome
(Apr 1977) |
 |
FES 76-77-4 - Final
EIS, WH Salt Dome (Jan 1977) |
 |
FES
76-5 - Supplement to EIS, BC Salt
Dome (May 1977) |
 |
DOE-EIS-0029 - Final EIS, Texoma
Salt Domes, Vol 1 (Nov 1978) |
 |
DOE-EIS-0029 - Final
EIS, Texoma Salt Domes, Vol 2 (Nov
1978) |
 |
DOE-EIS-0029 - Final EIS,
Texoma Salt Domes, Vol 3 (Nov 1978) |
 |
DOE-EIS-0029 -
Final EIS, Texoma Salt Domes, Vol 4
(Nov 1978) |
 |
DOE-EIS-0029 - Final EIS, Texoma
Salt Domes, Vol 5 (Nov 1978) |
 |
DOE-EIS-0024 - Final EIS, Capline
Salt Domes, Vol 1 (Jul 1978) |
 |
DOE-EIS-0024 - Final EIS, Capline
Salt Domes, Vol 2 (Jul 1978) |
 |
DOE-EIS-0024 - Final EIS, Capline
Salt Domes, Vol 3 (Jul 1978) |
 |
DOE-EIS-0024 - Final EIS, Capline
Salt Domes, Vol 4 (Jul 1978) |
 |
DOE-EIS-0010 - Final EIS, Sulphur
Mines Salt Dome (Mar 1978) |
 |
DOE-EIS-0021 - Final EIS, Seaway
Salt Domes, Vol 1 (Jun 1978) |
 |
DOE-EIS-0021 - Final EIS, Seaway
Salt Domes, Vol 2 (Jun 1978) |
 |
DOE-EIS-0034 - Final Supplement,
Expansion of SPR (Jan 1979) |
 |
DOE-EIS-0075 - Final Supplement,
Texoma-Seaway Phase III Development
(Oct 1981) |
 |
DOE-SPR-EIS-0075-SA-01
- 2004 NEPA Supplement Analysis,
Public Version (Mar 2004) |
 |
DOE-EIS-0385 Billion BBL Expansion
Vol.1 (Dec.2006) |
 |
DOE-EIS-0385
Billion BBL Expansion Vol.2
(Dec.2006) |
 |
DOE-EIS-0385 Billion
BBL Expansion Vol.3 (Dec.2006) |
 |
DOE-EIS-0385-SA-1 - Supplemental
Analysis to Final EIS, Site
Selection for SPR Expansion (2-8-07) |
 |
RONR - Richton Core Hole (6-2-08) |
 |
RONR - BH New Cavern Leaching
(3-20-09) |
 |
RONR - BC Cavern 102
Acquisition (4-7-10) |
 |
RONR - BC
Cavern 102 Acquisition (1-24-2011) |
 |
DOE-SPR-EIS-0075-SA-02 - 2009 NEPA
Supplement Analysis (Sept 2009) |
 |
EIS-0075-SA-03_F |
|